Pipe Cleaning, By-Pass and Same Day Return to Service

Description:

Often overlooked until cost are revealed, cleaning and by-pass pumping or diverting can be a major consideration in the scheduling and completion of a trenchless technology project. Inspecting to determine cleaning requirements, positioning of surface pumps, location of service connections above ground are all examples of the topics to be addressed in this seminar. In addition, with the increase in utilizing same day return to service scheduling, it is vital to ensure site operations are designed to fulfill this requirement. Updates on technology and specifications will ensure attendees bring these topics to the forefront of their future project considerations.

Tentative Schedule

8:00 – 8:10 | Welcome and Introduction, Gord Henrich, Pipe Mapper Co. 

8:10 – 8:50 | History of Sewer Pipe Cleaning: Past and present, Dave Crowder, R. V. Anderson Associates Limited

8:50 – 9:30 | Sewer: Clean to Inspect or Inspect to Clean – When to do what, Gord Henrich, Pipe Mapper Co.

9:30 – 10:00 | Design and Construction of Sewer By-pass Systems, Mark Knight, University of Waterloo

10:00 – 10:15 | NETWORKING BREAK

10:15 – 10:45 | TBD, Ken Edwards, Rain for Rent

10:45 – 11:15 | Considerations for Designing and Implementing a Successful By-pass System, Jason Bunston, Atlas Dewatering

11:15 – 11:45 | Watermain Evolution and Technological Changes within the Watermain Cleaning and Bypass Market, Mark Knight, University of Waterloo

11:45 – 12:45 | LUNCH

12:45 – 13:15 | Watermain Maintanence: A Continuous Process, Mike Mortimer, City of Waterloo

13:15 – 13:45 | Cleaning and By-pass for CIPP, Gerry Ramsay, Fer-Pal Construction

13:45 – 14:15 | Same Day Return to Service for Watermains, Aziz Ahmed, MOECC

14:15 – 14:30 | NETWORKING BREAK

14:30 – 15:00 | Introduction to Ice Pigging – Advanced Pipe Cleaning Technology, Paul Treloar, Utility Service Group

15:00 – 15:30 | New Watermain Cleaning Technology: Tomahawk System, Brian Thorogood, Envirologics Engineering

15:30 – 16:00 | Design and Construction of Sewer By-pass in Industrial Plants, Kyle Verwey, Evanco Environmental Technologies Inc.

REGISTER ONLINE BELOW OR CLICK TO DOWNLOAD THE REGISTRATION FORM

Location: Mississauga Grand | 35 Brunel Road (Brunel & Hurontario St.) | Mississauga ON L4Z 3E8 Canada

Fees (plus 13% HST)

CATT-MEMBER NON-MEMBER
Early-Bird Registration
(Received by December 19, 2014)
$325 $425
Regular Registration
(Received by December 20, 2014
to January 23, 2015)
$425 $525
On-Site Registration
(January 2, 2015)
$525 $625

We are sorry but registration for this event is now closed.

Please contact us if you would like to know if spaces are still available.

Event Registration and Ticketing Powered by Event Espresso