Pipe Cleaning, By-Pass and Same Day Return to Service

Description:

Often overlooked until cost are revealed, cleaning and by-pass pumping or diverting can be a major consideration in the scheduling and completion of a trenchless technology project. Inspecting to determine cleaning requirements, positioning of surface pumps, location of service connections above ground are all examples of the topics to be addressed in this seminar. In addition, with the increase in utilizing same day return to service scheduling, it is vital to ensure site operations are designed to fulfill this requirement. Updates on technology and specifications will ensure attendees bring these topics to the forefront of their future project considerations.

Tentative Schedule

  1. Introduction: history of pipe inspection
  2. Overview of tools and techniques of pipe cleaning
  3. Sewer inspection: techniques and tools
  4. Evolution and Changes within the sewer Cleaning market
  5. Design and construction of Sewer by pass systems
  6. Watermain inspection: techniques and tools
  7. Watermain Evolution and Technological
  8. Changes within the Watermain Cleaning and Bypass Market
  9. AWWA C651 (Watermain Disinfection) 
  10. New Watermain Cleaning Technology - Tomahawk System 
  11. Initiating a Watermain Cleaning Program
  12. Case studies

REGISTER ONLINE BELOW OR CLICK TO DOWNLOAD THE REGISTRATION FORM

Location: Mississauga Grand | 35 Brunel Road (Brunel & Hurontario St.) | Mississauga ON L4Z 3E8 Canada

Fees (plus 13% HST)

CATT-MEMBER NON-MEMBER
Early-Bird Registration
(Received by December 19, 2014)
$325 $425
Regular Registration
(Received by December 20, 2014
to January 23, 2015)
$425 $525
On-Site Registration
(January 2, 2015)
$525 $625

Price: C$525.00 + 13.00% HST

Start Time: 8:00 am
End Time: 5:00 pm

Date: January 28, 2015

Registration Details

Anti-Spam Measure: Please enter the following phrase

Event Registration and Ticketing Powered by Event Espresso